top of page

PROJECTS / Harbour Front Centre

XXX

XXX

1503_skizze_02 Kopie.png

XXX

XXX

Timber Construction

In terms of design, the main building is inspired by the Frisian houses typical of Sylt with low-pitched thatched roofs, relatively small façade areas and windows. The Lanserhof presents a contemporary interpretation: The main building rests on supports so that the ground floor could be glazed all around - a continuum of house and dune, interrupted only by partial glimpses of its inner life. The ridge and eaves swing gently, the soft shapes of the thatched roof trace the dune.

XXX

Data

Construction Start 2018
Completion 2022
Client Lanserhof Group

GFA 16,300 m² (main building), 3,150 m² (diagnostics building)

Credits

Project Management Bau und Projektentwicklung Lanserhof
Structural Design, Facade Design  
Werner Sobek

Fire Protection BPK

Energy Concept, Building Services DS-Plan

Landscape Design TGP / ENEA

Lighting Design Tropp Lighting Design

Building Physics DS-Plan

Awards

2023

MIPIM Awards  - Winner Best Tourism and Leisure Project

AHEAD Europe -  Winner Best Hotel Newbuild

WAF - Winner Completed Buildings, Hotel & Leisure

Architecture MasterPrize - Winner Healthcare/ Wellness

MORE PROJECTS

bottom of page